top of page
Compare EV Chargers
OHME
WHAT IS INCLUDED IN THE INSTALLATION
-
Installation of your chosen charger onto a suitable permanent structure, like brick or plaster wall.
-
Up to 15 metres of cable to connect the charger to the distribution board/electric meter.
-
A cable run through existing building voids or clipped directly to the wall, taking the shortest route possible and passing through no more than one wall.
-
6m of trunking provided
-
Associated protection devices to protect the charger and cable.
-
All necessary testing of installed equipment
-
Provision of necessary certification paperwork
bottom of page